-
Nepal rescuers drill through debris towards trapped tunnel workers
-
Soundcore Liberty 5 Pro Review: Call Quality Redefines Value in Wireless Earbuds
-
Manhunt in Switzerland after fatal rave shooting
-
Lexus ES Review: Electric ES 350e Falls Short in Luxury Saloon Segment
-
'No' camp seen winning Iceland's EU referendum
-
Vietnamese coffee farmers ride China's durian wave
-
Nepal flood survivors return to ruins to salvage memories
-
Venezuela says retains 'sovereignty' in US oil deal
-
Killing of Palestinian children and teens by Israel surges in West Bank
-
NASA's Roman telescope set to launch on cosmic mapping mission
-
Educators keep 9/11 memory alive for next generation, 25 years on
-
Data center backlash scrambles US midterm politics
-
Venezuelans view US oil deal with doubt, hope
-
Emotional Federer inducted into tennis Hall of Fame
-
Gobena and Jepchirchir power to Sydney Marathon victories
-
Hovland takes solo lead as McIlroy surges at Tour Championship
-
Iceland in suspense after close EU vote
-
Djokovic 'prepared' for US Open bid for history
-
Wallabies hold on for victory in Argentina
-
Atletico down Sevilla to go top of La Liga
-
Juve notch second straight win, Fiorentina's centenary party falls flat
-
US deports right-wing provocateur Milo Yiannopoulos
-
Rybakina eases injury fears ahead of US Open
-
Niger junta says it is back in control after soldiers' mutiny
-
Djokovic kicks off latest Grand Slam quest under US Open lights
-
Erasmus calls Rennie barbs over Springbok scrumming 'nonsense'
-
'Sorry' De Zerbi won't panic after Spurs shambles
-
Lawrence's fifty leaves Pakistan facing record chase to level England series
-
UN, Nepal warn of climate threat after deadly floods
-
Netanyahu condemns settler attack in flashpoint West Bank village
-
USTA boss says structure of new player council not yet set
-
Munoz saves Iraola in Liverpool draw, big-spending Spurs lose again
-
Tiny Elversberg stun Leverkusen on Bundesliga debut, Dortmund beat Hamburg
-
Newcastle condemn dismal Spurs to second successive defeat
-
Three Texas Tech softball players hurt in jet ski collision
-
Matt Leinart assesses Arch Manning and the leading names in college football
-
Rural Tamil Nadu students present 64 technology projects at IIT-M research park
-
Cyberabad civic body demolishes 19 unauthorised structures
-
Tambaram civic groups seek action on eight long-pending issues
-
Tamil Nadu goalball team’s national silver highlights need for wider support
-
Chennai councillors unite across parties to demand ward development funds
-
Tamil Nadu and NUS agree to expand postgraduate and research links
-
Court orders JIPMER assessment of Durai Dayanidhi before money-laundering trial
-
India and China have not named two new border meeting sites
-
French campaign sharpens as far right accuses left over civil disobedience calls
-
Kolkata police register new FIR against Mamata Banerjee over rally timing
-
About 50 Karnataka travellers return from Nepal as 24 remain missing
-
Andhra Pradesh Speaker seeks stronger sports quota and school facilities
-
Baladi Map app turns Lebanon’s local problems into a public record
-
Thirty-seven Mumbai pilgrims return after Nepal flood disruption
NASA cans lunar rover after spending $450 million building it
NASA announced Wednesday that cost overruns and delays have forced it to cancel a planned Moon rover it already spent $450 million to develop, marking a significant setback for the agency's lunar exploration program.
The Volatiles Investigating Polar Exploration Rover (VIPER) was intended to explore the lunar south pole in search of ice and other resources, paving the way for planned crewed missions by American astronauts under the Artemis program later this decade.
"Decisions like this are never easy," said Nicky Fox, NASA's associate administrator of the science mission directorate.
"But in this case, the projected remaining expenses for VIPER would have resulted in having to either cancel or disrupt many other missions."
The mobile robot, which NASA had hoped would venture into the Moon's permanently shadowed craters, where ice reserves have endured for billions of years, was originally planned to launch in 2023.
But in 2022, the US space agency requested a launch delay to late 2024 to allow more time for preflight testing of the Griffin lander vehicle, supplied by the Pittsburgh-based company Astrobotic under the new Commercial Lunar Payload Services (CLPS) program, a public-private venture.
The launch readiness date of the rover then slipped back further to September 2025, while the cost was projected to rise to $609.6 million.
Joel Kearns, deputy associate administrator for exploration in NASA's science mission directorate, added that Congress had been notified of the agency's decision.
The rover was "completely assembled" but had not yet undergone certain tests that would certify it could withstand launch, flying through the vacuum of space, and experiencing extreme temperatures, said Kearns.
But it was still possible the rover could be re-used in future missions, either in whole or in component parts, if NASA could reach a suitable agreement with industry partners who might be interested, he said.
Astrobotic, which in January launched the Peregrine lander that failed to reach the Moon, is still on track to launch in late 2025, but it will now carry a "mass simulator" or heavy weight in place of a NASA rover.
Kearns insisted that despite the setback, the United States was not falling behind in its space rivalry with China, which in June succeeded in returning the first ever samples from the far side of the Moon.
"We congratulate China's national space agency for the seemingly very successful Chang'e-6 mission," he said.
But he added that, by partnering with the space industry under the CLPS program, "we think that we're going to have a more robust science program and a more robust lunar landing capability in the United States."
E.Aziz--SF-PST